35kv Pre-installed Substation in GORI 20MW Wind Farm, Georgia
Scope of the contract (including design and supply): prefabricated cabinets, transformers, switch cabinets, secondary control protection, AC and DC power supplies, communications, fire protection, monitoring and control.